-
All trails including chairlift line mowed and/or hand cut
-
Damaged culverts in driveway replaced
-
Additional gravel added to driveway, major potholes fixed
-
Lighting added to parking area
-
Maintenance garage completed: siding, doors, roof, paint, and lighting
-
Complete removal of one junk mobile home
-
500+ tires removed from the hill
-
Selective removal of trees at base area to make slopes visible from road
-
New terrain roughed in by Badger and Lower Fawn
-
Dilapidated back restrooms on lodge demolished
-
New highway signs made, ready for install
-
Two sides of lodge painted
-
Two sides of ski shop painted
-
Lodge ceiling professionally sheetrocked
-
Repaired extensive water damage in lodge bathrooms
-
Lodge roof drainage reconfigured to prevent freezing
-
Lodge furnace and oil tank repairs/upgrades
-
Lodge enclosed porch: painted, new carpet, new furniture
-
Two large windows added to lodge facing chairlift
-
Purchased snowgroomer with tri-flex tiller, much better condition than existing equipment
-
Purchased 50+ late model snowboards with step-in bindings and 100+ pr boots for rental shop
-
Purchased Bombardier rubber tracked utility vehicle with plow
-
Purchased yard/plow truck
-
Purchased 50 snowtubes with tow straps
-
Annual independent NDT inspection of chairlift grips and chair frames
-
Annual independent inspection of chairlift cable
-
Welded reinforcement/wear pads to all chair frames
-
Replaced 12 worn chairlift sheave liners
-
Replaced chairlift bullwheel liners
-
Painted chairlift top shack, added window for better visibility down lift line
-
Began painting of lift towers- over half completed
-
Survey/profile of chairlift and new handle tow by professional surveyor
-
Dynamic load test procedure for chairlift designed and written by professional engineer
-
Existing dump truck restored to running condition
-
500 ft handle tow for snowtubing purchased, concrete work completed, lift put in place
-
Electrical work for tube lift and tube slope snowmaking & lights initiated- 600+ ft of buried 4-0 five conductor cable put in place.
-
Existing buildings relocated for use as snowtubing park shacks
-
Mobile home furnace replaced
-
New electcal service to ski shop, garage, and mobile home
-
Picnic tables painted
-
Old motocross course graded out